National Geodetic Survey, Retrieval Date = JANUARY 1, 2003 DC1873 *********************************************************************** DC1873 DESIGNATION - GRUNT USE 1941 DC1873 PID - DC1873 DC1873 STATE/COUNTY- CA/SAN DIEGO DC1873 USGS QUAD - SWEENEY PASS (1959) DC1873 DC1873 *CURRENT SURVEY CONTROL DC1873 ___________________________________________________________________ DC1873* NAD 83(1992)- 32 45 10.44385(N) 116 13 33.36009(W) ADJUSTED DC1873* NAVD 88 - 735. (meters) 2411. (feet) VERTCON DC1873 ___________________________________________________________________ DC1873 EPOCH DATE - 1991.35 DC1873 LAPLACE CORR- -9.70 (seconds) DEFLEC99 DC1873 GEOID HEIGHT- -32.72 (meters) GEOID99 DC1873 DC1873 HORZ ORDER - THIRD DC1873 DC1873.The horizontal coordinates were established by classical geodetic methods DC1873.and adjusted by the National Geodetic Survey in June 1996. DC1873.The horizontal coordinates are valid at the epoch date displayed above. DC1873.The epoch date for horizontal control is a decimal equivalence DC1873.of Year/Month/Day. DC1873 DC1873.The NAVD 88 height was computed by applying the VERTCON shift value to DC1873.the NGVD 29 height (displayed under SUPERSEDED SURVEY CONTROL.) DC1873 DC1873.The Laplace correction was computed from DEFLEC99 derived deflections. DC1873 DC1873.The geoid height was determined by GEOID99. DC1873 DC1873; North East Units Scale Converg. DC1873;SPC CA 6 - 565,015.465 2,002,255.365 MT 1.00000520 +0 00 47.6 DC1873;SPC CA 6 - 1,853,721.57 6,569,066.14 sFT 1.00000520 +0 00 47.6 DC1873;UTM 11 - 3,624,159.085 572,511.891 MT 0.99966483 +0 25 07.7 DC1873 DC1873: Primary Azimuth Mark Grid Az DC1873:SPC CA 6 - WINDY USE 1941 087 30 09.0 DC1873:UTM 11 - WINDY USE 1941 087 05 48.9 DC1873 DC1873|---------------------------------------------------------------------| DC1873| PID Reference Object Distance Geod. Az | DC1873| dddmmss.s | DC1873| DC1872 WINDY USE 1941 APPROX. 2.9 KM 0873056.6 | DC1873|---------------------------------------------------------------------| DC1873 DC1873 SUPERSEDED SURVEY CONTROL DC1873 DC1873 NAD 83(1986)- 32 45 10.44614(N) 116 13 33.36050(W) AD(1984.00) 3 DC1873 NAD 27 - 32 45 10.24487(N) 116 13 30.28500(W) AD( ) 3 DC1873 NGVD 29 - 734. (m) 2408. (f) VERT ANG DC1873 DC1873.Superseded values are not recommended for survey control. DC1873.NGS no longer adjusts projects to the NAD 27 or NGVD 29 datums. DC1873.See file dsdata.txt to determine how the superseded data were derived. DC1873 DC1873_U.S. NATIONAL GRID SPATIAL ADDRESS: 11SNS7251224159(NAD 83) DC1873_MARKER: DD = SURVEY DISK DC1873_SETTING: 0 = UNSPECIFIED SETTING DC1873_STABILITY: D = MARK OF QUESTIONABLE OR UNKNOWN STABILITY DC1873 DC1873 HISTORY - Date Condition Report By DC1873 HISTORY - 1941 MONUMENTED USE DC1873 DC1873 STATION DESCRIPTION DC1873 DC1873'DESCRIBED BY US ENGINEERS 1941 DC1873'STATION IS STANDARD DISK IN ROCK, STAMPED GRUNT. DC1873' DC1873'STATION IS LOCATED ON HILL WEST ACROSS CARRIZO WASH FROM TUNNEL 19 DC1873'ON SAN DIEGO-ARIZONA RAILROAD, ABOUT 8.0 MILES NORTH OF JACUMBA. DC1873' DC1873'TO REACH FROM JACUMBA POST OFFICE GO EAST ON U.S. HIGHWAY 80, 14.2 DC1873'MILES THRU INKOPAH GORGE, AND ACROSS CONCRETE BRIDGE TO SECOND SET DC1873'OF GUARD RAILS ON LEFT OF ROAD, 0.4 MILES EAST OF BRIDGE, TURN LEFT DC1873'ON DIRT ROAD AND GO 4.4 MILES PAST MICA MINE, ACROSS RAILROAD TO DC1873'JUNCTION, TURN LEFT AND GO 2.6 MILES AND CROSS RAILROAD TRACKS, DC1873'GO 1.9 MILES AND CROSS RAILROAD TRACKS, TURN RIGHT AND GO 1.3 DC1873'MILES ALONG RAILROAD TO DOS CABEZAS, FOLLOW ROAD TO END OF TRUCK DC1873'TRAVEL. WALK UP RAILROAD TO SOUTH END OF TUNNEL 19, TURN RIGHT DC1873'AND GO DOWN STEEP GRADE INTO CARRIZO WASH, FOLLOW CARRIZO WASH DC1873'NORTH ABOUT 1.0 MILE AND TURN LEFT INTO SMALLER WASH, FOLLOW THIS DC1873'WASH ABOUT 1.0 MILE TO JUNCTION OF TWO CANYONS, CLIMB STEEP DC1873'ROCKY LEDGE TO RIGHT AND TO TOP OF HILL. DC1873' DC1873'REFERENCE MARK 1 IS STANDARD DISK IN ROCK, STAMPED R.M. 1.